文本描述
设计题目:xx花园小区3#甲楼基础工程设计 专 业:土木工程(岩土工程) 学 生:xxxxxx (签名) 指导教师:xxx (讲师)(签名) 摘要 本文根据《xx花园小区 3#甲楼住宅楼岩土工程详勘报告》,首先,通过地基 基础方案论证,确定本工程采用钻孔灌注桩基础方案;其次,根据桩基础设计程 序,确定了桩基础的各项设计参数并完成了各种验算,根据承台设计程序,确定 了承台的各项设计参数并完成了各项验算;根据勘察报告,确定了基坑围护方案; 最后,完成了施工组织设计及工程概预算,得出总费用为 540万元。 关键词:桩基础;基坑围护;施工组织;工程概预算 类 型:设计型 Subject: Design of foundation for the first part of Residential building-3 in xxxx Garden community Speciality: Civil Engineering (Geotechnical Engineering) Undergratuate: xxxxxxxxx Instructor: xxx (Signature) (Signature) ABSTRACT Thispieceofthesis,basedontheGeotechnicalEngineering Investigation Report of the first part of Residential building-3 in xxxx Garden community,through foundationscheme argumentation, piled foundation is selected, and the type of pile is perfusion pile of reinforced concrete. Secondly, according to the process of foundation design, the parameters of piled foundation and was selected and proved effective through my checking computations. Next, the scheme of foundation pit support was given. Lastly, I finished the construction organization and the budgetary estimate of the project,5.4millon. Key words: piledfoundation, foundation pitsupport, construction organization, budgetary estimate of the project Type: Design 目录 设计总说明··················································································································1 第一章工程概况········································································································3 1.1建筑物状况·······································································································3 1.2场地地质条件···································································································3 1.3本章小结···········································································································6 第二章桩基的设计与计算 ·············