文本描述
目 录 第一章编制依据···································4 第一节编制说明································4 第二节编制原则································4 第二章工程概况及目标·····························6 第一节工程简介································6 第二节主要施工内容····························6 第三节工期、质量目标··························6 第三章施工平面布置及配合措施·····················6 第一节施工平面布置·····························7 第二节与其它施工单位配合措施···················9 第四章施工准备···································9 第一节技术准备································9 第二节现场准备································10 第三节原材料的采购供货组织、计划使用、保管····10 第五章施工总体部署规划···························11 第一节施工组织的特点··························11 第二节现场条件的特点分析······················12 第三节工程项目组织机构························12 第四节施工各部门职责··························13 第五节施工协调管理····························16 第六节施工总体安排····························18 第六章主要工程项目的施工程序和施工方法···········19 1 第一节施工顺序·································19 第二节装饰工程施工主要工艺流程·················19 第三节主要工序的施工方法及技术措施·············19 第四节墙面工程································20 第五节地面工程·································20 一、橡胶地板地面 二、防水工程 三、地砖地面 第六节涂料工程·································22 第七节卫生间工程······························24 一、卫生间隔断安装 二、卫生间地面工程 第七章施工进度计划及说明·························26 第一节进度控制的任务···························26 第二节进度控制的方法··························27 第三节进度控制措施·····························27 第四节施工进度(见附表一)······················28 第五节工期保证优化措施及限期赶工措施···········29 第六节主要材料采购要求及供应计划···············32 第七节主要施工机械设备需用计划·················33 第八节劳动力计划(见附表二)·····················35 第九节节约计划·································35 第八章工程质量目标及保证措施······················38 第一节施工质量管理·····························38 2 1、施工质量控制的特点 2、施工质量控制的原则 3、施工质量因素的控制 4、施工质量控制阶段 5、工期的技术组织及保证措施 第二节施工技术管理工作的质量控制···············50 第三节本工程关键部位质量控制措施···············53 第九章安全、文明施工以及环保保证措施·············54 第一节保证安全措施·····························54 第二节文明施工管理措施·························58 第三节环保与环卫管理···························59 第四节夜间施工措施·····························60 第十章施工成本管理······