中英文工程合同DOC格式

天地文学
V 实名认证
内容提供者
欧亿·体育(中国)有限公司大小:12KB(压缩后)
文档格式:DOC
欧亿·体育(中国)有限公司语言:中文版/英文版/日文版
解压密码:m448
更新时间:2019/1/24(发布于江苏)

类型:积分欧亿·体育(中国)有限公司
积分:10分 (VIP无积分限制)
推荐:升级会员

   点此下载 ==>> 点击下载文档


“中英文工程合同DOC格式”第1页图片 图片预览结束,如需查阅完整内容,请下载文档!
文本描述
Contract of Construction Project
合同编号: Contract Number:
工程名称: Project Name:
发包方(甲方): 工程设计顾问(北京)
Employer (Party A): International Consulting Engineers ( Beijing) Limited
承包方(乙方): 中寰艺高建筑装饰工程有限公司
Contractor (Party B): Zhong Huanyigao Building Decoration Engineering Co. , Ltd
根据《中华人民共和国合同法》和《建筑安装工程承包合同条例》及有关规定,为明确双方在施工过程中的权利、义务和经济责任,经双方协商同意签订本合同

In order to make definite of the rights, obligations and economic responsibilities of both parties during the construction, the parties, in accordance with The PRC Contract Law and Construction Engineering Contract Regulations and relevant provisions, agree to sign this contract.
第一条工程项目Article 1, Project item
2.工程范围: Scope of project
3.工程造价:人民币 元整 (该造价为包工包料价)
Project cost: PMB Yuan only(Cost of this contract is the contract price for labor and materials)
第二条施工准备 Article 2, Preparation for construction
甲方协助乙方办理临时水电及垂直运输,提供建筑图纸及有关隐蔽障碍物的欧亿·体育(中国)有限公司

Party A shall assists party B to deal with the procedures of temporary hydropower and vertical transportation and provide architectural drawings and documents of relevant concealed obstacles .
乙方:. Party B:
① 负责施工区域的临时设施、水电管线的铺设、管理、使用和维修工作;
Be responsible for the works of laying, management, use and maintenance of the temporary facilities, water and electricity pipeline in the construction area.
② 组织施工管理人员和材料、施工机械进场;
Organize construction management staff and construction materials, construction machinery enter the Site.
③ 负责在装修期间保持公共地方清洁及每天负责将装物料弃置于由管理处指定的垃圾收集处

Be responsible for keeping public places clean during construction and packing construction material and leaving in the garbage collection place designated by management office each day.
第三条工程期限 Article 3 Period of Construction
1. 根据工期和使用需要,商定工程总施工期为 天(日历天),自 年 月 日开工至 年 月 日完工
According to the period of construction and the use need, the total construction period agreed shall be days (Calendar days), start from the date of and complete on the date of .
如遇下列情况,经甲方现场代表签证后,工期相应顺延:
Construction period shall be prolonged upon Party A si
。。。以上简介无排版格式,详细内容请下载查看

版权所有: 欧亿·体育(中国)有限公司©2025 客服电话: 0411-88895936 18842816135

欧亿·体育(中国)有限公司