![]() |
In order to make definite of the rights, obligations and economic responsibilities of both parties during the construction, the parties, in accordance with The PRC Contract Law and Construction Engineering Contract Regulations and relevant provisions, agree to sign this contract.
第一条工程项目Article 1, Project item
2.工程范围: Scope of project
3.工程造价:人民币 元整 (该造价为包工包料价)
Project cost: PMB Yuan only(Cost of this contract is the contract price for labor and materials)
第二条施工准备 Article 2, Preparation for construction
甲方协助乙方办理临时水电及垂直运输,提供建筑图纸及有关隐蔽障碍物的欧亿·体育(中国)有限公司
Party A shall assists party B to deal with the procedures of temporary hydropower and vertical transportation and provide architectural drawings and documents of relevant concealed obstacles .
乙方:. Party B:
① 负责施工区域的临时设施、水电管线的铺设、管理、使用和维修工作;
Be responsible for the works of laying, management, use and maintenance of the temporary facilities, water and electricity pipeline in the construction area.
② 组织施工管理人员和材料、施工机械进场;
Organize construction management staff and construction materials, construction machinery enter the Site.
③ 负责在装修期间保持公共地方清洁及每天负责将装物料弃置于由管理处指定的垃圾收集处
Be responsible for keeping public places clean during construction and packing construction material and leaving in the garbage collection place designated by management office each day.
第三条工程期限 Article 3 Period of Construction
1. 根据工期和使用需要,商定工程总施工期为 天(日历天),自 年 月 日开工至 年 月 日完工
According to the period of construction and the use need, the total construction period agreed shall be days (Calendar days), start from the date of and complete on the date of .
如遇下列情况,经甲方现场代表签证后,工期相应顺延:
Construction period shall be prolonged upon Party A si
。。。以上简介无排版格式,详细内容请下载查看
版权所有: 欧亿·体育(中国)有限公司©2025 客服电话: 0411-88895936 18842816135
欧亿·体育(中国)有限公司